Expert Commissioning, Direct from DEL Ozone.
All Del Ozone systems have a comprehensive installation manual along with detailed drawings for electrical and plumbing hook-up for each type of installation. Any mechanical contractor or pool contractor is capable of installing DEL equipment on any commercial pool or public swimming venue. Upon installation a DEL Field Service engineer is called in to check the installation, start up the systems on the venue, and make any corrections or adjustments to the system. Once the system is operational, the operations , maintenance and facility personnel are trained on the operation, functionality, maintenance and performance of the system and given a certificate of completion of the training.
What we do:
- Verify proper installation of your ozone system.
- Check all electrical and plumbing connections for proper materials and orientation.
- Optimize and fine tune all adjustable components for site specific parameters.
- Perform initial start-up.
- Verify operation of external control components.
- Provide training to operators and/or maintenance personnel.
- Certify the application and installation and initiate the warranty.
- Establish a record of installation specifics (photos, notes, optional equipment, etc) to provide the best customer support possible.
- Present service contract and extended warranty options.
Who performs the commissioning service?
This service is provided specifically by Del Ozone customer support service technicians. While preventative maintenance, warranty claims service, and emergency repair services may be performed by any one of our numerous Authorized Service Providers; we feel that commissioning is a critical process that allows the customer to interact with the factory support personnel, and should only be carried out by a factory technician or engineer.
When does commissioning take place?
Once the equipment has been received and installed the owner/operator shall submit a Pre-Commissioning Checklist to Del Ozone for review. Once this has been reviewed the commissioning will be scheduled, and usually can be performed within 2-3 weeks from receipt of the Pre-Commissioning Checklist.
The DEL Ozone Aquatics Program is Easy as 1-2-3:
1. Request a quote. We’ll size your system according to MAHC guidelines and send a quote right away.
2. We’ll deliver and commission your pre-installed system within one to two months.
3. Begin to enjoy the improvements to your water quality and your facility right away.